BMW Plant Debrecen (Northwest Industrial Park) – Site Preparations
-
Services: Project Management
-
Client: Debreceni Infrastruktúra Fejlesztő Kft. (personal assignments of the management team of THINK)
-
Project Period: September 2018 – on-going
Mr. Tibor Kukai, as assigned Project Director, currently leads the infrastructure developments of the Northwest Economical Zone [Industrial Park]. The 650-hectare area is located West from the City of Debrecen. The infrastructure projects include the entire public utility networks (fresh water supply, sewerage, rainwater discharge, electricity energy supply, natural gas supply), the completion of public roads and the implementation of railway- and motorway connections to the Industrial Park.
The 400-hectare site of the BMW Group Plant is located within the Industrial Park. Its full-scale land works has been coordinated by Mr. Zoltán Kósa, as the commissioned Project Leader, from finalising the technical program through permitting, design development, tendering up to the successful technical handover. The complexity of the project is indicated by the fact that there has never been an example of such a large-scale site preparation project in Hungary with such a short lead time.